![]() | |||||||||||||
![]() | |||||||||||||
| |||||||||||||
|
| |||||||||||||
CASE STUDY #1 : Location : USA Description : Rehabilitation of 5000 US-ton hydraulic Open Die Forging Press and modernization of drive and controls Scope of Supply : * Consultant for the rehabilitation of the press mechanics and detail design of a new frame with improved concept * Design & supply of main parts of existing hydraulic controls operating at 6000 psi * Design and supply additional of electronic controls * Design and supply of Press Frame * Supervision during dismantling, re-erection & commissioning Specification : * Improved press frame with column in tie rod design with adjustable flat guides * New single cylinder crosshead (was 3-cylinder crosshead) * Eccentric load controlYear : 2003 | |||||||
![]() | |||||||
![]() | ![]() | ||||||
CASE STUDY #2 Location : South Africa Description : Modernization of a 2nd hand 1000 US ton Open Die Forging Press Scope of Supply : * Redesign press frame to rehabilitate frame and cylinder and add a shifting table and a 2 position bottom cross die slide system * Design & supply for a new 2 pump oil hydraulic drive system * Design new foundation system for all equipment above * Design and supply new Electronic controls * Commissioning Specification : * 2 in/sec pressing speed Year : 2003 | ||
![]() | ![]() | |||||
![]() | ||||||
CASE STUDY #3 Location : Brazil Description : Modernization of a 3000 ton Open Die Forging Press installation Scope of Supply : * Redesign press frame to new column concept and add shifting table and flexible die change for top & bottom dies with magazine * Design & supply for a new 8 pump oil hydraulic drive system * Design & supply for modernization of a 25 ton railb. Manipulator * Design & supply for modernization of a 16 ton railb. Manipulator * Design new foundation system for all equipment above * Design and supply new Electronic controls * Commissioning Specification : * 4 in/sec pressing speed * integrated forging operation with 2 different Manipulators * SPC integrated process control Year : 2002 | ||
![]() | ||||||||
![]() | ||||||||
![]() | ||||||||
![]() | ||||||||
More Case Studies : | ||
Home - Company Portrait - Pumps - Forging - Parts / Service - Contact Us - Site Map | ||