list includes many but not all of Wepuko-Pahnke forging installations. |
|
|
|
|
|
|
Case
Studies 1-3 |
|
|
|
|
|
Case
Studies 4-7 |
Included are partial systems, system upgrades,
enhancements and control retrofits as well as complete turnkey Forging
Systems. If you desire more complete information on a specific installation
or on a certain type of installation please contact WPE directly for more
information. |
|
|
|
Case
Studies 8-10 |
|
|
|
|
Reference List |
|
|
|
|
|
|
|
|
|
|
|
Parts
/ Service |
|
|
| |
Contact
Us |
|
|
|
|
|
|
Downloads |
|
|
|
|
|
|
|
|
WPE Terms & Conditions |
|
| |
|
| |
|
| |
|
| |
|
| |
Forging
Installations by Wepuko-Pahnke : |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
| |
Order |
Location |
Description |
|
|
| Year |
|
| 2003 |
USA |
3 position die magazine, cross
die slide and upper die rotate gear for 3500 Ton Press |
|
| 2003 |
USA |
Electronic Controls To A 5000
Ton Closed Die Press (Verson) |
|
| **
Engineering & Supply Of Replacement Controls With Added Diagnostic
Functions And Spec-Data Log. & Ethernet Link To The WPE Service Station |
|
| **
Commissioning |
|
| 2002 |
USA |
Electronic Controls To 1800 Ton
Open Die Forge Press With One 15 Ton Railb. Manipulator: |
|
| **
Engineering & Supply Of Replacement Controls With Added Diagnostic
Functions And Spec-Data Log. |
|
| **
Commissioning |
|
| 2002 |
USA |
Electronic
Controls To A 750 Ton Open Die Forge Press With Two 3000 Lbs Railb.
Manipulators: |
|
| **
Engineering & Supply Of Replacement Controls With Added Program Forge,
Diagnostic |
|
| Features,
Ethernet Link To The WPE Service Station |
|
| **
Commissioning |
|
| 2002 |
USA |
Repair & Modernize A 5.000
Ton Open Die Press |
|
| **
Consultant Service To The Mechanical Repairs: |
|
| **
Detailed Design Of New Press Frame With New Concept |
|
| **
Supply All Materials To Press Frame |
|
| **
Engineering And Supply Of Revisions And Extensions To The Press Hydraulic
Drive & Controls |
|
| **
Revise And Expand The Electronic Controls |
|
| **
Supervision For Dismantling And Re-Erection |
|
| **
Commissioning |
|
| 2002 |
USA |
Repair Of 3000 Ton Upsetting
& Punch Press |
|
| **
Consultant Service To The Mechanical Repairs: |
|
| **
Assistance In Dismantling Processing |
|
| **
Detailed Design Of New Press Columns With Adjusted Design |
|
| 2002 |
USA |
Electronic Controls To A 1500
Ton Open Die Press With One 25 Ton Railb. Manipulator |
|
| **
Engineering & Supply Of Replacement Controls With Added Diagnostic Functions |
|
| **
Commissioning |
|
| 2002 |
USA |
Electronic Controls To A 5000
Ton Closed Die Press (HPM) |
|
| **
Engineering & Supply Of Replacement Controls With Added Diagnostic
Functions And Spec-Data Log. |
|
| **
Commissioning |
|
| 2001 |
South Africa |
To A 1000 Ton Open Die Forging
Press: |
|
| |
**
Engineering To The Press Mechanic: For Adding A (3) Position Die Train And A
Shifting Table |
|
| |
** Supply New Hydraulic System |
|
| |
** Supply New Electronic
Controls |
|
| 2001 |
Canada |
To A 5000 Ton Open Die Forging
Press |
|
| **
Supply Extra Hydraulics To Operate Added Three (3) Die Trains |
|
| **
Adjust The Existing Electronic Controls Accordingly |
|
| 2001 |
Brazil |
Create A 3300 Ton Open Die
Forging Press Installation With 2 Railb. Manipulators And Transfer Car Under
The Use Of Existing: |
|
| **
Engineering To A New Foundation To All Equipment |
|
| ** Engineering For Rebuild The Press |
|
| Mechanics
As Follows: |
|
| - New Press Column Concept (Tie
Rod) |
|
|